Annie Moore Trail Work
September 7, 2020
![](https://boltontrails.org/wp-content/uploads/2020/09/AM-trail-work-1-1-480x500.jpg)
A downed tree was removed from the trail near Annie Moore Road. Additionally, a sign which had been taken down along with a fallen tree has been rehung near Bolton-Stow junction.
![](https://boltontrails.org/wp-content/uploads/2020/09/AM-trail-work-1-rotated.jpg)
![](https://boltontrails.org/wp-content/uploads/2020/09/Am-2-rotated.jpg)
![](https://boltontrails.org/wp-content/uploads/2020/09/AM-3-rotated.jpg)
![](https://boltontrails.org/wp-content/uploads/2020/09/AM-4-rotated.jpg)
The website of Bolton Trails Committee. Maps, routes, paths and events on conservation land in Bolton Massachusetts
September 7, 2020
A downed tree was removed from the trail near Annie Moore Road. Additionally, a sign which had been taken down along with a fallen tree has been rehung near Bolton-Stow junction.