Trails cleared at Fyfeshire and Wilder
January 14, 2021
![](https://boltontrails.org/wp-content/uploads/2020/12/AM-work-1-12-13-2020-480x500.jpg)
![](https://boltontrails.org/wp-content/uploads/2021/01/DC1FFF8C-3833-4E6D-87A7-D497B8A027BC.jpeg)
On Sunday 11 January 2021 Larry and Gordon cleared blown down trees that were blocking the paths at Fyfeshire and at the Wilder Farm area. There were also a few small logs that lay across the trails and could have caused an issue for skiers and mountain bikers.
![](https://boltontrails.org/wp-content/uploads/2021/01/03A51709-FC6B-458F-9D8A-C1590F188883.jpeg)
![](https://boltontrails.org/wp-content/uploads/2021/01/8C6BF7F7-0815-4C5A-8A1A-CEFCCE9BDD03.jpeg)
At Wilder, there was a minor blockage on the trail away from the 117 Parking area and further along the route a large tree obstructed the new Goose Pond Trail.
![](https://boltontrails.org/wp-content/uploads/2021/01/C7BA6D76-024D-4719-BB96-BE9C11397E36.jpeg)
![](https://boltontrails.org/wp-content/uploads/2021/01/A8DB784B-7031-42A3-9D87-B81BD5118816.jpeg)
![](https://boltontrails.org/wp-content/uploads/2021/01/112E2F7D-D395-46AD-BD49-4847E0EB1E63.jpeg)
![](https://boltontrails.org/wp-content/uploads/2021/01/8B214DB6-2AEA-4E5E-BFD5-CF7ED18D5BE1.jpeg)