Bolton Trails

The website of Bolton Trails Committee. Maps, routes, paths and events on conservation land in Bolton Massachusetts

Trails Cleared at Vaughn Hills and Moen

Over several days, a number of blockages have been cleared on the Vaughn Hills and Moen areas. The problems were reported by a trail user via the special page on the Boltontrails.org website. Rebecca Longvall, Larry Kunz and Gordon Taylor followed up by checking the paths.

Later, Drew Schaubhut removed fallen trees from the paths near the North Summit of Vaughn Hills. Then on 8 December a team consisting of Larry Kunz, Steve Rothman, and Gordon Taylor tackled about five fallen trees on the Moen areas. It was getting late in the afternoon and the light was fading so the team plan to return to complete the task on the remaining few blockages.

There are more! Watch for upcoming posts as these are cleared.

Cleared by Drew
Also cleared by Drew
Cleared by Larry, Steve and Gordon
Steve and Gordon
Larry showing where the path should be on this second one of the day.
Path cleared
The first clearance of a couple of smaller ones on the way
The second of the smaller ones. this had been there for a long time. It was very rotten
Done
The last one was huge. This picture was taken after all of smaller limbs had been cleared from the trail.
Steve rolling the big log out of the way

Leave a Reply

Your email address will not be published. Required fields are marked *