Bolton Trails

The website of Bolton Trails Committee. Maps, routes, paths and events on conservation land in Bolton Massachusetts

Bridge Surface Repaired at Moen

On one of the new bridges installed in 2024, the gravel surface had been disturbed and the underlying landscape cloth had been torn by an unknown misuse of the trail (possibly by MTB braking or dragging a large, rough item along the path). So, on 7 September 2025, a team of Chris Demers, Keith Silver and Gordon Taylor removed gravel, installed new cloth and replaced everything.

 

Removing the gravel and torn cloth
Installing new cloth
Replacing the gravel

Leave a Reply

Your email address will not be published. Required fields are marked *