Bolton Trails

The website of Bolton Trails Committee. Maps, routes, paths and events on conservation land in Bolton Massachusetts

The Bridge Project continues at locations 4 and 5

In July and August 2024 more wooden structures were put into place by the team which at various times consisted of Larry Kunz (assisted by his granddaughter, Isabel), Keith Silver, Chris DeMers, Drew Schaubhut, and Gordon Taylor. The next phase with all of this group of crossings in the Moen area will be to bring them up to the standard of the earlier bridge that was built near the Hansen land during the Winter. Rock ramps, star-pack infill, landscape cloth and pea stone will be added to complete the project.

Leave a Reply

Your email address will not be published. Required fields are marked *